To increase the productivity of Hydro-tester, GIPI specialists from Production Department, have been planned to replace the intensifier with high pressure pump. As high pressure pump takes less man-power effort and less time for maintenance.
The main purposes of this modification were as: existing Intensifier system is too old and right now it is not in practice; problem finding is very tough and we can’t see or observe any internal leakages etc.; after finding solution, solving time is too much (24 hrs. to 36 hrs.); huge maintenance cost & productivity loss.
After all observations and inspections, which were made by GIPI technical specialists, it were indicated the main advantages of equipment modification, such as: